BS 7000-4:2013

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Design management systems Guide to managing design in construction

Available format(s)

Hardcopy , PDF

Withdrawn date

31-05-2024

Language(s)

English

Published date

31-10-2014

$588.37
Including GST where applicable

Foreword
0 Introduction
Section 1 - General
1 Scope
2 Normative references
3 Terms and definitions
Section 2 - Framework for design management
4 General
5 Formation and management of the design team
6 Responsibilities
7 Establishing the brief
8 Project plan
9 Process plan
10 Programming
11 Classification
12 Project communications
13 Costs to the client/employer
Section 3 - Design resource management
14 Staff resource
15 Innovation and value management (VM)
16 Technical information
17 Manual, CAD and BIM production
18 Records management
19 Technical equipment
20 Procuring design, surveying and other related services
21 Extracting data requirements
22 Intellectual property and copyright
Section 4: Design process management
23 General
24 Pre-commission review
25 Design brief
26 Design stages
27 Progress validation
28 Design data control
29 Design during construction
30 Monitoring during construction
31 Testing
32 Completion
33 Post occupancy
34 Design management appraisal
Bibliography

Provides guidance on management of the construction design process at all levels, for all organizations and for all types of construction projects.

Committee
B/555
DevelopmentNote
Supersedes BS 7000-4(1996). (12/2013) Supersedes 12/30240618 DC. (01/2014)
DocumentType
Standard
Pages
46
PublisherName
British Standards Institution
Status
Withdrawn
Supersedes

This part of BS7000 gives guidance on management of the construction design process at all levels, for all organizations and for all types of construction projects. The guidance given is applicable to purpose-built constructions, equipment and components. It is intended for those who work in and with the construction industry, particularly designers and those managing design. Where general management principles are given, they may be adapted to suit any size of design organization or construction project. The guidance given is applicable to management of design activities throughout the life-cycle of a construction project, and the principles of the facilities management function.

This part of BS7000 makes reference to, but does not cover activities prior to client/employer initiation of a project or factors considered by clients/employers when selecting the most appropriate form of construction procurement.

NOTE1 Guidance on the design of manufactured products and services is given in BS7000‑2 and BS7000‑3 respectively.

NOTE2 This part of BS7000 complements BSENISO9001.

BS 8536-1:2015 Briefing for design and construction Code of practice for facilities management (Buildings infrastructure)
BS 7000-2:2015 Design management systems Guide to managing the design of manufactured products
BS 8536-2:2016 Briefing for design and construction Code of practice for asset management (Linear and geographical infrastructure)
BS 8541-6:2015 Library objects for architecture, engineering and construction Product and facility declarations. Code of practice
BS 8541-5:2015 Library objects for architecture, engineering and construction Assemblies. Code of practice
15/30315620 DC : 0 BS 8536 - FACILITY MANAGEMENT BRIEFING - CODE OF PRACTICE
14/30296635 DC : 0 BS 7000-2 - DESIGN MANAGEMENT SYSTEMS - GUIDE TO MANAGING THE DESIGN OF MANUFACTURED
15/30296207 DC : DRAFT FEB 2015 BS 8895-2 - DESIGNING FOR MATERIAL EFFICIENCY IN BUILDING PROJECTS - PART 2: CODE OF PRACTICE FOR CONCEPT DESIGN AND DEVELOPED DESIGN
BS PAS 8810(2016) : 2016 TUNNEL DESIGN - DESIGN OF CONCRETE SEGMENTAL TUNNEL LININGS - CODE OF PRACTICE
16/30333120 DC : 0 BS 8536-2 - BRIEFING FOR DESIGN AND CONSTRUCTION - PART 2: CODE OF PRACTICE FOR ASSET MANAGEMENT (LINEAR AND GEOGRAPHICAL INFRASTRUCTURE)
BS 8895-2:2015 Designing for material efficiency in building projects Code of Practice for concept and developed design
BS 1192(2007) : 2007 COLLABORATIVE PRODUCTION OF ARCHITECTURAL, ENGINEERING AND CONSTRUCTION INFORMATION - CODE OF PRACTICE

BS PAS 1192-2(2013) : 2013 SPECIFICATION FOR INFORMATION MANAGEMENT FOR THE CAPITAL/DELIVERY PHASE OF CONSTRUCTION PROJECTS USING BUILDING INFORMATION MODELLING
BS 8534:2011 Construction procurement policies, strategies and procedures. Code of practice
BS ISO 15489-1:2016 Information and documentation. Records management Concepts and principles
BS EN ISO 9001:2015 Quality management systems. Requirements
BS EN ISO 10012:2003 Measurement management systems. Requirements for measurement processes and measuring equipment
BIP 0008-2 : 2014 EVIDENTIAL WEIGHT AND LEGAL ADMISSIBILITY OF INFORMATION TRANSFERRED ELECTRONICALLY: CODE OF PRACTICE FOR THE IMPLEMENTATION OF BS 10008
BS 7000-3:1994 Design management systems Guide to managing service design
BS 4778-2:1991 Quality vocabulary Quality concepts and related definitions
BS ISO 12006-2:2015 Building construction. Organization of information about construction works Framework for classification
BS ISO/IEC 27000 : 2016 INFORMATION TECHNOLOGY - SECURITY TECHNIQUES - INFORMATION SECURITY MANAGEMENT SYSTEMS - OVERVIEW AND VOCABULARY
BS ISO 16739 : 2013 COR 2017 INDUSTRY FOUNDATION CLASSES (IFC) FOR DATA SHARING IN THE CONSTRUCTION AND FACILITY MANAGEMENT INDUSTRIES
BS EN 12973:2000 Value Management

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.