Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

AWS D1.2 : 1997

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

STRUCTURAL WELDING CODE - ALUMINUM

Superseded date

23-07-2013

Superseded by

AWS D1.2/D1.2M : 2014

Published date

12-01-2013

Sorry this product is not available in your region.

Personnel
Foreword
Preface (including guidelines for preparation of technical
         inquiries for structural welding committee
List of tables
List of figures
1 General provisions
2 Design of welded connections
    Part A - General requirements
    Part B - Standard joint details
3 Fabrication
4 Qualification of WPSs and personnel
    Part A - General requirements
    Part B - Types of tests, test methods and acceptance
             criteria
    Part C - WPS qualification
    Part D - Performance qualification
5 Inspection
    Part A - General requirements
    Part B - Radiographic testing of groove welds in
             butt joints
    Part C - Ultrasonic testing of groove welds
6 Stud welding
    Part A - General requirements
    Part B - Arc stud welding
    Part C - Capacitor discharge stud welding
7 Nontubular statically loaded structures
    Part A - General requirements
    Part B - Allowable stresses
    Part C - Workmanship
8 Nontubular dynamically loaded structures
    Part A - General requirements
    Part B - Allowable stresses
    Part C - Workmanship
9 Tubular structures
    Part A - General requirements
    Part B - Allowable stresses
    Part C - Details of T-, Y-, and K-connections
    Part D - Workmanship - class I structures
    Part E - Repair of defective base metal and
             defective welds
10 Strengthening and repair of existing structures
Annexes
Commentary on structural welding code - aluminum
Foreword
C1 General provisions
C2 Design of welded connections
C3 Fabrication
C4 Qualification of WPS and personnel
    Part A - General requirements
    Part B - Types of tests, test methods and acceptance
             criteria
    Part C - WPS qualification
    Part D - Performance qualification
C5 Inspection
    Part A - General requirements
    Part B - Radiographic testing of groove welds in
             butt joints
    Part C - Ultrasonic testing of groove welds
C6 Stud welds
    Part B - Arc stud welding
C7 Nontubular statically loaded structures
    Part A - General requirements
    Part B - Allowable stresses
    Part C - Workmanship
C8 Nontubular dynamically loaded structures
    Part A - General requirements
    Part B - Allowable stresses
    Part C - Workmanship
C9 Tubular structures
    Part A - General requirements
    Part B - Allowable stresses
    Part C - Details of T-, Y-, and K-connections
    Part D - Workmanship - class I structures
C10 Strengthening and repair of existing structures

Contains the requirements for fabricating and erecting welded aluminum structures, the design of welded connections, weld procedure and welder performance qualification, inspection procedures and acceptance criteria, stud welding procedures, and the repair and strengthening of existing structures.

DocumentType
Standard
PublisherName
American Welding Society
Status
Superseded
SupersededBy
Supersedes

MIL T 0022238 : J TANK, LIQUID STORAGE, METAL, FOR PETROLEUM PRODUCTS
NFPA 1914 : 2002 TESTING FIRE DEPARTMENT AERIAL DEVICES
MIL-J-26149 Revision E:1988 Jack, Hydraulic, Aircraft Maintenance, General Specification for
MIL-P-53124 Base Document:1992 POWER UNITS/POWER PLANTS, ELECTRIC, DIESEL ENGINE, TRAILER MOUNTED
MIL-B-52118 Revision E:1991 BALK DECK
MIL-STD-372 Base Document:1988 WELDING, GAS METAL-ARC AND GAS TUNGSTEN-ARC, ALUMINUM ALLOYS, READILY WELDABLE FOR STRUCTURES, EXCLUDING ARMOR
CSA B354.1:2004 PORTABLE ELEVATING WORK PLATFORMS
MIL-P-53125 Base Document:1992 POWER PLANTS, ELECTRIC, DIESEL ENGINE, TRAILER MOUNTED, GENERAL SPECIFICATION FOR
AWS C5.10/C5.10M : 2003 RECOMMENDED PRACTICES FOR SHIELDING GASES FOR WELDING AND CUTTING
AWS D17.1 : 2001 SPECIFICATION FOR FUSION WELDING FOR AEROSPACE APPLICATIONS
AWS GWF : 1998 GUIDE FOR SETTING UP A WELDER TRAINING FACILITY
NFPA 1901:2016 AUTOMOTIVE FIRE APPARATUS
MIL-A-52963 Revision B:1986 AIR CONDITIONER: SPLIT-PACKAGE, 208-VOLT, 3-PHASE, 400-HERTZ, AC, 18,000 BTU/HR COOLING, 30,000 BTU/HR HEATING
MIL-A-52767 Revision D:1989 AIR CONDITIONER: VERTICAL AND HORIZONTAL, COMPACT
MIL-HDBK-1587 Base Document:1996 MATERIALS AND PROCESS REQUIREMENTS FOR AIR FORCE WEAPON SYSTEM
MIL-P-53065 Base Document:1986 PUMPING UNIT, FRAME MOUNTED, 1-1/2 INCH, ELECTRIC MOTOR DRIVEN, 35 GPM AT 25 FEET TOTAL HEAD
MIL-A-0052767 Revision E:1994 AIR CONDITIONERS: VERTICAL AND HORIZONTAL, COMPACT
MIL-C-52788 Revision B:1992 CONTAINER, REFRIGERATED: 8 FEET X 8 FEET X 20 FEET, INSULATED
MIL STD 11991 : A GENERAL STANDARD FOR PARTS, MATERIALS, AND PROCESSES
SAE ARP 1967 : 2014 CONTAINERS, SHIPPING AND STORAGE, REUSABLE
MIL-PRF-53090 Revision B:2016 BLADE, MINE CLEARING
MIL-C-0052980 Revision C:1994 COMPRESSORS, RECIPROCATING AND ROTARY, AIR DIESEL-ENGINE-DRIVEN, OR GASOLINE-ENGINE-DRIVEN
AISC 204 : 2008 AISC CERTIFICATION PROGRAM FOR BRIDGE AND HIGHWAY METAL COMPONENT MANUFACTURERS
MIL-C-13899 Revision F:1985 COMPRESSOR UNIT, ROTARY: AIR, WHEELBARROW-FRAME-MOUNTED, TWO PNEUMATIC TIRES, GASOLINE-ENGINE-DRIVEN, 60-CFM, 6.5-PSIG
MIL-PRF-12732 Revision F:2010 HYPOCHLORINATION UNIT, WATER PURIFICATION, FRAME MOUNTED, AUTOMATICALLY CONTROLLED 2 TO 350 GPM FLOW
MIL-P-52746 Revision C:1994 PUMP ASSEMBLY, FLAMMABLE LIQUID, CENTRIFUGAL, SELF PRIMING 2 INCH 100 GPM AT 100 FEET TOTAL DYNAMIC HEAD
MIL-B-29159 Revision A:1989 BOAT SYSTEM, UTILITY, NOMINAL, 20-FOOT REINFORCED PLASTIC WITH 100-HORSEPOWER OUTBOARD ENGINE AND TRAILER
CSA B354.4 : 2002 : R2013 SELF-PROPELLED BOOM-SUPPORTED ELEVATING WORK PLATFORMS
CSA B354.4 : 2002 : R2007 : FR SELF-PROPELLED BOOM-SUPPORTED ELEVATING WORK PLATFORMS
MIL-C-52037 Revision F:1990 COMPRESSOR UNIT, RECIPROCATING, POWER DRIVEN, AIR, 15 CFM 3,500 PSI
AWS D10.7M/D10.7 : 2008 GUIDE FOR THE GAS SHIELDED ARC WELDING OF ALUMINUM AND ALUMINUM ALLOY PIPE
AWS D8.14M/D8.14 : 2000 SPECIFICATION FOR AUTOMOTIVE AND LIGHT TRUCK COMPONENTS WELD QUALITY - ALUMINIUM ARC WELDING
AWS D3.7 : 2004 GUIDE FOR ALUMINUM HULL WELDING
ANSI E1.21 : 2013 ENTERTAINMENT TECHNOLOGY - TEMPORARY STRUCTURES USED FOR TECHNICAL PRODUCTION OF OUTDOOR ENTERTAINMENT EVENTS
ASTM F 1369 : 1993 : REV A Standard Specification for Heaters, Convection, Steam and Hot Water (Withdrawn 2002)
NEMA XR 14-1990 (R1995, R2000) RECOMMENDED PRACTICES FOR LOAD-BEARING MECHANICAL ASSEMBLIES USED IN DIAGNOSTIC IMAGING
MIL-S-52098 Revision C:1992 STIFFENER ASSEMBLY, BALK CONNECTING
IEEE 1070-2006 IEEE Guide for the Design and Testing of Transmission Modular Restoration Structure Components
MIL-L-51050 Revision B:1971 LABORATORY, PETROLEUM,SEMITRAILER MOUNTED
MIL-T-52296 Revision D:1983 TRANSOM ASSEMBLY, 60 TON UNIVERSAL TRANSOM
MIL R 52105 : D RAMP, RAFT
MIL-PRF-53051 Revision C:2017 PUMPING ASSEMBLIES, WHEEL-MOUNTED, DIESEL ENGINE DRIVEN, BULK TRANSFER, FUEL AND POTABLE WATER PUMPING SERVICE
MIL-F-52569 Revision C:1992 FOOTWALK ASSEMBLY, ALUMINUM FOR BRIDGE BAILEY
AWS B5.4 : 2005 SPECIFICATION FOR THE QUALIFICATION OF WELDER TEST FACILITIES
MIL STD 1693 : A NOTICE 2 FABRICATION WELDING AND INSPECTION OF HYPERBARIC CHAMBERS AND OTHER CRITICAL LAND BASED STRUCTURES
CSA B354.1 : 2004 : R2011 PORTABLE ELEVATING WORK PLATFORMS
MIL-P-52200 Revision C:1992 PONTOON BOAT, HALF SECTION, ALUMINUM HULL, SPOON BOW
AWWA C562 : 2014 FABRICATED ALUMINUM SLIDE GATES
NASA MSFC SPEC 504 : 1990 WELDING, ALUMINIUM ALLOYS
NASA SPEC 5004A : 2003 WELDING OF AEROSPACE GROUND SUPPORT EQUIPMENT AND RELATED NONCONVENTIONAL FACILITIES
NASA PRC 0001 : 2012 PROCESS SPECIFICATION FOR THE MANUAL ARC WELDING OF ALUMINUM ALLOY HARDWARE
NASA KSC SO S 9 : 1993 RETEST AND REFURBISHMENT OF COMPRESSED GAS TRAILERS AND MOVABLE STORAGE UNITS, STANDARD FOR
NASA KSC STD Z 0004 : 2002 STRUCTURAL DESIGN, STANDARD FOR
NASA KSC SPEC E 0002 : 2010 MODULAR ELECTRICAL ENCLOSURES, RACKS, CONSOLES, AND ACCESSORIES, SPECIFICATION FOR
MIL-S-52881 Revision B:1989 SERVICING UNITS, COMPRESSED GAS, MOBILE
CSA B354.1 : 2004 : R2016 PORTABLE ELEVATING WORK PLATFORMS
CSA B354.2 : 2001 : R2013 SELF-PROPELLED ELEVATING WORK PLATFORMS
CSA B354.2 : 2001 : R2011 SELF-PROPELLED ELEVATING WORK PLATFORMS
MIL-P-11859 Revision H:1991 PONTON BOATS, ALUMINUM, FOR FLOATING FOOTBRIDGE
CSA B354.2 : 2001 SELF-PROPELLED ELEVATING WORK PLATFORMS
CSA B354.4 : 2002 : R2007 SELF-PROPELLED BOOM-SUPPORTED ELEVATING WORK PLATFORMS
NFPA 1904 : 1991 AERIAL LADDER AND ELEVATING PLATFORM FIRE APPARATUS
MIL-P-53123 Base Document:1992 POWER UNITS/POWER PLANTS, ELECTRIC, DIESEL ENGINE, TRAILER MOUNTED, GENERAL SPECIFICATION FOR
MIL-DTL-22342 Revision E:1995 BROWS, ALUMINIUM, BEAM AND TRUSS
MIL-DTL-62749 Revision A:2010 BRIDGE, FIXED: ALUMINUM, HIGHWAY, UNITED KINGDOM, MEDIUM GIRDER AND ERECTION, AND TRANSPORTATION EQUIPMENT, FULLY COMPETITIVE COMPONENTS FOR
MIL-PRF-83041 Revision C:2000 FILTER-SEPARATOR, LIQUID FUEL SKID MOUNTED, 600 GALLONS PER MINUTE
MIL H 53076 : 1987 HEMTT TANKER AVIATION REFUELING SYSTEM (HTARS)
SAE ARP 4898 : 2005 STANDS, SHIPPING AND STORAGE, AIRCRAFT ENGINES, REUSABLE
MIL-P-52284 Revision C:1992 POST, HANDRAIL, FOOTBRIDGE
A-A-52315 Revision A:2015 PUMPS, RECIPROCATING, POWER-DRIVEN: DIAPHRAGM, DIESEL-ENGINE-DRIVEN, WHEEL-MOUNTED
CSA B354.4:2002 SELF-PROPELLED BOOM-SUPPORTED ELEVATING WORK PLATFORMS
CSA C225 : 2010 : INC : UPD 1 : 2011 VEHICLE-MOUNTED AERIAL DEVICES
CSA C225 : 2010 : R2015 VEHICLE-MOUNTED AERIAL DEVICES
CSA C225: 2010 VEHICLE-MOUNTED AERIAL DEVICES
AWS WHC1.05 : 0 WELDING SCIENCE AND TECHNOLOGY, WELDING HANDBOOK, 9TH ED., VOL 1 - CHAPTER 5: DESIGN FOR WELDING

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more