ASME STP-NU-001 : 2005
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
RISK INITIATIVES IN ASME NUCLEAR CODES AND STANDARDS
29-08-2024
25-03-2005
Foreword
Summary
1 INTRODUCTION
2 NUCLEAR C&S DEVELOPMENTS
3 COHERENCE OF RISK INITIATIVES
References
Acknowledgments
Abbreviations and Acronyms
Gives an assessment of coherence among the nuclear power plant risk-informed initiatives that have been undertaken in the ASME Section XI, Operations and Maintenance (O&M), and Nuclear Risk Management organizations of ASME Nuclear C&S.
DocumentType |
Standard
|
PublisherName |
American Society of Mechanical Engineers
|
Status |
Withdrawn
|
CFR 10(PTS0-199) : JAN 87 | ENERGY - NUCLEAR REGULATORY COMMISSION |
ANS 58.21-2007 | EXTERNAL EVENTS IN PRA METHODOLOGY |
ASME RA-S : 2008 | LEVEL 1/LARGE EARLY RELEASE FREQUENCY PROBABILISTIC RISK ASSESSMENT FOR NUCLEAR POWER PLANT APPLICATIONS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.