Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

API MPM CH4.6 : 1999

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

MANUAL OF PETROLEUM MEASUREMENT STANDARDS - CHAPTER 4 - PROVING SYSTEMS - SECTION 6 - PULSE INTERPOLATION

Available format(s)

PDF

Language(s)

English

Published date

01-05-1999

Superseded date

03-03-2014

$141.89
Including GST where applicable
Summarise this standard

0 INTRODUCTION
1 SCOPE
2 DEFINITIONS
3 REFERENCES
4 DOUBLE-CHRONOMETRY PULSE INTERPOLATION
  4.1 Conditions of Use
  4.2 Flowmeter Operating Requirements
5 ELECTRIC EQUIPMENT TESTING
6 FUNCTIONAL OPERATIONS TEST REQUIREMENTS
7 CERTIFICATION TEST
8 MANUFACTURER'S CERTIFICATION TESTS
APPENDIX A - PULSE-INTERPOLATION CALCULATIONS

Covers double-chronometry method for meter proving.

DocumentType
Standard
Pages
20
ProductNote
Reconfirmed 1999
PublisherName
American Petroleum Institute
Status
Superseded
SupersededBy

⚠

A newer version of this standard is available.

View Current Edition
$141.89
Including GST where applicable