
API 2TD : 2006
Current
The latest, up-to-date edition.

GUIDELINES FOR TIE-DOWNS ON OFFSHORE PRODUCTION FACILITIES FOR HURRICANE SEASON
Hardcopy , PDF
English
01-06-2006
1 DRILLING AND WORKOVER DRILLING UNITS
1.1 Background
1.2 Philosophy
1.3 Short-Term Recommendations
1.4 Intermediate-Term Recommendations
2 PERMANENT EQUIPMENT AND FACILITIES
2.1 Background
2.2 Philosophy/Design Conditions
2.3 Short-Term Recommendations
2.4 Intermediate-Term Recommendations
Raises the awareness of the need to evaluate the tie-downs in use on offshore production facilities for drilling rigs, permanent equipment, and facilities such as quarters, helidecks, etc.
DocumentType |
Standard
|
Pages |
14
|
PublisherName |
American Petroleum Institute
|
Status |
Current
|
API 2FPS : 2011 | PLANNING, DESIGNING, AND CONSTRUCTING FLOATING PRODUCTION SYSTEMS |
API 2A WSD : 2014 | PLANNING, DESIGNING, AND CONSTRUCTING FIXED OFFSHORE PLATFORMS - WORKING STRESS DESIGN |
API 2SIM : 2014 | STRUCTURAL INTEGRITY MANAGEMENT OF FIXED OFFSHORE STRUCTURES |
API 2INT-DG : 2007 | INTERIM GUIDANCE FOR DESIGN OF OFFSHORE STRUCTURES FOR HURRICANE CONDITIONS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Logging out.