ACI 522.1M : 2013
Current
The latest, up-to-date edition.
SPECIFICATION FOR PERVIOUS CONCRETE PAVEMENT (METRIC)
Hardcopy , PDF
English
01-10-2013
PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
NOTES TO SPECIFIER
General Notes
FOREWORD TO CHECKLISTS
MANDATORY REQUIREMENTS CHECKLIST
SUBMITTALS CHECKLIST
Specifies materials, preparation, forming, placing, finishing, jointing, curing, and quality control of pervious concrete pavement.
Committee |
522
|
DocumentType |
Standard
|
Pages |
11
|
PublisherName |
American Concrete Institute
|
Status |
Current
|
ACI 305.1 : 2014 | SPECIFICATION FOR HOT WEATHER CONCRETING |
ACI 305.1M : 2014 | SPECIFICATION FOR HOT WEATHER CONCRETING (METRIC) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.