Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

ACI 351.5 : 2015

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

SPECIFICATION FOR INSTALLATION OF EPOXY GROUT BETWEEN FOUNDATIONS AND EQUIPMENT BASES

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-05-2015

Superseded date

05-12-2024

$79.89
Including GST where applicable

PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
NOTES TO SPECIFIER
General notes
Foreword to checklists
MANDATORY REQUIREMENTS CHECKLIST

Specifies minimum requirements for epoxy grouting between foundations and equipment bases. Included are requirements for materials, placement, and quality control.

Committee
351
DocumentType
Standard
Pages
7
PublisherName
American Concrete Institute
Status
Superseded
SupersededBy

ACI 351.3R:2018 351.3R-18: Report on Foundations for Dynamic Equipment

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

$79.89
Including GST where applicable