UIC 520 : 7ED 2003
Current
The latest, up-to-date edition.
WAGONS, COACHES AND VANS - DRAW GEAR - STANDARDISATION
01-12-2013
Specifies the draw gear systems to be used for wagons, coaches and vans, viz. the standard unified screw coupling, the coupling hook and the elastic draw systems. The use of the standardised screw coupler is compulsory for new stock with effect from 1 July 2003. It is recommended, however, that no further supplies of standard draw hooks or their component parts should be ordered.
DocumentType |
Standard
|
PublisherName |
Union Internationale des Chemins de Fer
|
Status |
Current
|
PREN 14033-1 : DRAFT 2014 | RAILWAY APPLICATIONS - TRACK - RAILBOUND CONSTRUCTION AND MAINTENANCE MACHINES - PART 1: TECHNICAL REQUIREMENTS FOR RUNNING |
04/30118531 DC : DRAFT AUG 2004 | EN 5020 - RAILWAY APPLICATIONS - TOWING COUPLER - PERFORMANCE REQUIREMENTS, SPECIFIC INTERFACE GEOMETRY AND TEST METHODS |
BS EN 15566:2016 | Railway applications. Railway rolling stock. Draw gear and screw coupling |
14/30258493 DC : 0 | BS EN 14033-1 - RAILWAY APPLICATIONS - TRACK - RAILBOUND CONSTRUCTION AND MAINTENANCE MACHINES - PART 1: TECHNICAL REQUIREMENTS FOR RUNNING |
DIN EN 14033-1:2014-08 (Draft) | RAILWAY APPLICATIONS - TRACK - RAILBOUND CONSTRUCTION AND MAINTENANCE MACHINES - PART 1: TECHNICAL REQUIREMENTS FOR RUNNING |
I.S. EN 15566:2016 | RAILWAY APPLICATIONS - RAILWAY ROLLING STOCK - DRAW GEAR AND SCREW COUPLING |
BS EN 14033-1:2017 | Railway applications. Track. Railbound construction and maintenance machines Technical requirements for running |
I.S. EN 14033-1:2017 | RAILWAY APPLICATIONS - TRACK - RAILBOUND CONSTRUCTION AND MAINTENANCE MACHINES - PART 1: TECHNICAL REQUIREMENTS FOR RUNNING |
I.S. EN 15020:2006 | RAILWAY APPLICATIONS - RESCUE COUPLER - PERFORMANCE REQUIREMENTS, SPECIFIC INTERFACE GEOMETRY AND TEST METHODS |
PREN 15566 : DRAFT 2013 | RAILWAY APPLICATIONS - RAILWAY ROLLING STOCK - DRAW GEAR AND SCREW COUPLING |
UNI EN 15020 : 2011 | RAILWAY APPLICATIONS - RESCUE COUPLER - PERFORMANCE REQUIREMENTS, SPECIFIC INTERFACE GEOMETRY AND TEST METHODS |
13/30241415 DC : 0 | BS EN 15566 - RAILWAY APPLICATIONS - RAILWAY ROLLING STOCK - DRAW GEAR AND SCREW COUPLING |
03/317142 DC : 0 | PREN 14033-1 - RAILWAY APPLICATIONS - TRACK - TECHNICAL REQUIREMENTS FOR RAILBOUND CONSTRUCTION AND MAINTENANCE MACHINES - PART 1: RUNNING OF RAILBOUND MACHINES |
BS EN 15020 : 2006 | RAILWAY APPLICATIONS - RESCUE COUPLER - PERFORMANCE REQUIREMENTS, SPECIFIC INTERFACE GEOMETRY AND TEST METHODS |
DIN EN 15020:2011-01 | Railway applications - Rescue coupler - Performance requirements, specific interface geometry and test methods (includes Amendment A1:2010) |
EN 14033-1:2017 | Railway applications - Track - Railbound construction and maintenance machines - Part 1: Technical requirements for running |
EN 15020:2006+A1:2010 | Railway applications - Rescue coupler - Performance requirements, specific interface geometry and test methods |
EN 15566:2016 | Railway applications - Railway rolling stock - Draw gear and screw coupling |
UNE-EN 15566:2017 | Railway applications - Railway rolling stock - Draw gear and screw coupling |
DIN EN 14033-1:2017-10 | RAILWAY APPLICATIONS - TRACK - RAILBOUND CONSTRUCTION AND MAINTENANCE MACHINES - PART 1: TECHNICAL REQUIREMENTS FOR RUNNING |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.