• Shopping Cart
    There are no items in your cart

10599-4

Current

Current

The latest, up-to-date edition.

Cool Room Construction Safe Work Method Statement

Available format(s)

Word

Language(s)

English

Published date

05-30-2023

This Cool Room Construction Safe Work Method Statement (SWMS) provides a way for your business to outline how to carry out cool room construction safely.

DocumentType
Misc Product
Pages
15
ProductNote
This is the 'Cool Room Construction' Safe Work Method Statement (SWMS), written by SafetyDocs by SafetyCulture Pty Ltd.

It is a Word DOC, not a PDF so you can add logos, change colours and add or delete information as needed. It contains commonly encountered safety aspects and is not a blank template.

You should add your company details. You can then print it for incorporation into your overall OHS system, as well for inductions, toolbox talks or tender applications.

Note you will require MS Word to use this template.
PublisherName
SafetyCulture Pty Ltd
Status
Current
Supersedes

Our sandwich panel installation method statement is the perfect solution for anyone who needs help with their cool room construction. It covers all of the hazards and controls associated with building insulated panels that are used in cool rooms or freezers.

We have included everything you need to know about how to keep yourself and others safe while working on these types of projects. This document will ensure that everyone involved knows precisely what they should be doing throughout the entire process, so there are no accidents along the way.

You can feel confident knowing that our Cold Room Safe Work Method Statement (SWMS) has been created by industry experts who understand all of your concerns when it comes to building a new cold storage facility or freezer room from scratch, such as mobile plant movement, risks of a person falling from 2m or more, and work near telecommunications towers.

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

FREE Legislation & Codes of Practice Reference List

Job Steps Covered in Cool Room Construction SWMS:
(includes potential hazards and control measures)

Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
Planning
Working Outdoors
Arrival On-site & Assess On-site Conditions
Work Area Set-up
Environment
Housekeeping
Manual Tasks
Materials Delivery
Working with Powered & Non-powered Tools
Hazardous Substance/Chemical Use
Working at Height on Ladders, Trestles, Mobile Scaffold, Fixed Scaffold & Openings
Cutting, Trimming, Joining Panels & Angle Lengths
Positioning & Levelling Base Panels
Standing Wall Panels & Installing Roof Panels
Working Around Powered Mobile Plant
On Completion
Emergency Response

Version 3

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.