05/30137813 DC : DRAFT AUG 2005
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
Superseded date
05-31-2007
Superseded by
Published date
11-23-2012
Publisher
Sorry this product is not available in your region.
Committee |
PEL/88
|
DocumentType |
Draft
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
ISO/IEC 9646-7:1995 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 7: Implementation Conformance Statements |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
ISO/IEC 9646-6:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 6: Protocol profile test specification |
ISO/IEC 9646-2:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 2: Abstract Test Suite specification |
IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
ISO/IEC 9646-4:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 4: Test realization |
ISO/IEC 9646-5:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 5: Requirements on test laboratories and clients for the conformance assessment process |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
IEC 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
ISO/IEC 9646-1:1994 | Information technology Open Systems Interconnection Conformance testing methodology and framework Part 1: General concepts |
IEC 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.